Skip to content

Two EV charging units proposed on Rayleigh Road in Eastwood

Southend-on-Sea Council has registered an application for two electric vehicle charging units and changes to the car park layout. No decision is recorded.

RegisteredPublished

Photo: Len Williams via Wikimedia Commons, CC BY-SA 2.0

In this article7 sections
  1. Key takeaways
  2. What is planned on Rayleigh Road?
  3. Has Southend Council approved the charging units?
  4. How can I check the plans or comment?
  5. About the figures
  6. Source
  7. Further reading

Key takeaways

  • Ward: Eastwood Park
  • Address: 405 - 409 Rayleigh Road Eastwood Essex SS9 5JG
  • Proposal: Installation of feeder pillar cabinet associated with 2 electric vehicle charging units, bollards and associated alterations to car parking layout

The proposal would add 2 electric vehicle charging units at a site on Rayleigh Road in Eastwood Park, alongside a feeder pillar cabinet and protective bollards.

The application is for changes to the car park layout as well as the charging equipment. It is registered as a full planning application, but the council has not recorded a decision.

What is planned on Rayleigh Road?

The application, reference 26/01478/FUL, covers a feeder pillar cabinet associated with the two charging units, bollards and alterations to the car parking layout. The site is at 405–409 Rayleigh Road, in Eastwood Park.

The application does not state in the details published here when work might begin or how much it would cost.

Has Southend Council approved the charging units?

No. The council’s planning register lists the application as registered, with no decision recorded. Registration means the application has been logged; it is not planning permission.

How can I check the plans or comment?

View the application documents and check the council’s latest position on the Southend-on-Sea planning register. The register is the place to check whether comments are being accepted and any applicable deadline.

For general information about the planning process, see the GOV.UK planning permission guide.

About the figures

Southend-on-Sea Council’s planning register lists this full application as received, validated and published on 10 November 2026. Its status is registered, and no decision is recorded; the register entry does not provide a construction timetable or cost.